Challenges
Design, engineer, build, ship and install 5 star modular hotel in 3.5 months. Install location at high altitude in remote location with poor access roads. Rooms had to be very high end and not in any way appear modular.
Solution
XCUBE designed and delivered modules finished inside and out exceeding luxury hotel standards for style, quality and durability. Interiors , windows, doors & facades and roof were completed 100% in the factory prior to dis-assembling. Trucking 3000 Km with no breakage. Modules were installed (2 days) and trimmed out in 5 days onsite. 100% of all that was needed for the hotel was shipped out of the XCUBE factory.
Applicable fields
Luxury hotels, resorts, lodges and properties world wide. XCUBE modular hotel solution means a hotel project can be open for business in 5-8 months instead of 2-3 years.
Advantages
Speed: 5-8 months from design to opening Quality: Factory finished modules using only the highest quality materials and craftsmanship (Toto bathrooms, Daikin AC units, Imported lift and slide bay windows) Cost: 2 additional year of revenue means the room pays for itself. Price range from 1,500-2,500 US$ all-in Convenience: 1 stop shop for hotel, furniture & fittings, HVAC etc.